A bathroom, start to finish
What happens when
The same corner of a shower, drawn in section at each step. What is new at each step is drawn in blue.
01
The room as it is
We come and look at the room, measure it, and ask how it is used: who gets ready in it, what never has a place, what you are tired of cleaning. The design, the cabinetry and the selections are settled here, before anything is pulled out, so the work runs to a plan.
02
Stripped back to the frame
Tiles, sheeting and fittings come out, down to the timber frame and the slab. The frame is checked while it is open, because this is the only time it can be.
03
Pipes and waste set out
Water lines are run inside the frame to the exact heights of the mixer, the shower and the basin, and the floor waste is set where the floor will fall. Every tap you chose in step one is placed now.
04
Sheeted, graded, waterproofed
Wet-area board goes on the frame. A bed is laid on the floor to fall to the waste, and a waterproof membrane goes over wall and floor, to the Australian Standard for wet areas, before a single tile is laid.
05
Tiled
Wall tiles are set out from the mirror, the niche and the tapware so the joints land where they should. The floor tiles follow the fall to the waste.
06
Fitted off
Vanity, tapware, shower rose, glass, mirror, lights and power are fitted, and everything is tested.
07
Handed over
The room is cleaned and walked through with you. You get a bathroom that works the first time you use it.
A guide to the usual order of work. Every renovation is planned with you, and the timing depends on the room and the selections.